Region: Puget Sound | Legislative District: 39 | Length: 0.00 mi. | FY 2023 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 11,070 | 1,230 | 12,300 |
Right of Way | 0 | 0 | 0 |
Construction | 127,260 | 14,140 | 141,400 |
Project Totals | $138,330 | $15,370 | $153,700 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Grind and 2-inch overlay of the following segments: E Alpine St - Granite Ave to 350ft East E Union St - Indiana Ave to Alder Ave