Region: Puget Sound | Legislative District: 48 | Length: 0.00 mi. | FY 2023 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 11,118 | 1,962 | 13,080 |
Right of Way | 0 | 0 | 0 |
Construction | 203,830 | 35,970 | 239,800 |
Project Totals | $214,948 | $37,932 | $252,880 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 10% |
Grind and 2-inch overlay of NE 7th Street from 84th Ave NE to Overlake Dr.