|
|
||||
Region: West | Legislative District: 20 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 855 | 45 | 900 |
Right of Way | 0 | 0 | 0 |
Construction | 45,180 | 3,281 | 48,461 |
Project Totals | $46,890 | $2,471 | $49,361 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Digout, patching, crack sealing and chip sealing