Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 23,000 | 0 | 23,000 |
Right of Way | 0 | 0 | 0 |
Construction | 177,000 | 0 | 177,000 |
Project Totals | $200,000 | $0 | $200,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack seal longitudinal and transverse cracks, perform subgrade repair as necessary, and overlay the existing roadway with 2-inches of HMA. It is assumed that subgrade repair will be required to transition to side streets. If the pavement is thick enough for planing, then transition planing may be used to transition to side streets to reduce the subgrade repair area and costs.