Region: West | Legislative District: 39 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 7,599 | 401 | 8,000 |
Right of Way | 0 | 0 | 0 |
Construction | 182,401 | 9,628 | 192,029 |
Project Totals | $190,000 | $10,029 | $200,029 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
The project scope will be to provide a 2" HMA overlay to Limestone Street from N. Superior to E Ave. and provide for crosswalk and channeliztiaon improvements.