Region: East | Legislative District: 16 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 27,900 | 3,100 | 31,000 |
Right of Way | 0 | 0 | 0 |
Construction | 272,880 | 30,320 | 303,200 |
Project Totals | $300,780 | $33,420 | $334,200 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
2-inch overlay