FY 2022 Seal Coat Project
Multiple Locations
TIB Award Amount
$122,726
Region: East   |   Legislative District: 12   |   Length: 0.00 mi. FY 2022 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 14,161 0 14,161
Right of Way 0 0 0
Construction 108,565 0 108,565
Project Totals $122,726 $0 $122,726

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Chip seal of Roosevelt Way from River Drive to Fir Street. Crack Seal of Mead Way from Fir Street to Central Drive, Central Drive from Mead Way to Crest Drive, and Crest Drive from Central Way to River Drive.