Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 14,161 | 0 | 14,161 |
Right of Way | 0 | 0 | 0 |
Construction | 108,565 | 0 | 108,565 |
Project Totals | $122,726 | $0 | $122,726 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Chip seal of Roosevelt Way from River Drive to Fir Street. Crack Seal of Mead Way from Fir Street to Central Drive, Central Drive from Mead Way to Crest Drive, and Crest Drive from Central Way to River Drive.