|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 1,900 | 100 | 2,000 |
Right of Way | 0 | 0 | 0 |
Construction | 97,850 | 12,150 | 110,000 |
Project Totals | $106,400 | $5,600 | $112,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Prep and chip