|
|
||||
Region: West | Legislative District: 10 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 15,466 | 815 | 16,281 |
Right of Way | 0 | 0 | 0 |
Construction | 177,865 | 9,362 | 187,227 |
Project Totals | $193,331 | $10,177 | $203,508 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
2 inch and 1 inch overlays