Region: Puget Sound | Legislative District: 31 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 10,450 | 550 | 11,000 |
Right of Way | 0 | 0 | 0 |
Construction | 123,006 | 6,474 | 129,480 |
Project Totals | $133,456 | $7,024 | $140,480 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 0% |
This project repairs area of pavement failure and provides a 2-inch overlay of Carbonado-Wilkeson Road between AP Tubbs Road and Town limits