Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 2,375 | 125 | 2,500 |
Right of Way | 0 | 0 | 0 |
Construction | 37,989 | 1,999 | 39,988 |
Project Totals | $40,364 | $2,124 | $42,488 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
W. Franklin Street provides access to local residents. Connell plans to replace the water main in W. Franklin Street in combination with the proposed street work. Work includes crack sealing, minor pavement repairs and prelevel work, and chip sealing.