Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 107,848 | 5,677 | 113,525 |
Project Totals | $107,848 | $5,677 | $113,525 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
The project provides prelevel, pavement repair, crack seal and double chip seal of the approved segments.