|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 17,300 | 0 | 17,300 |
Right of Way | 0 | 0 | 0 |
Construction | 179,960 | 0 | 179,960 |
Project Totals | $197,260 | $0 | $197,260 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
The project provides pavement repair, crack seal, chip seal and fog seal of the approved segments.