Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 3,000 | 0 | 3,000 |
Right of Way | 0 | 0 | 0 |
Construction | 89,196 | 0 | 89,196 |
Project Totals | $92,196 | $0 | $92,196 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
The project provides prelevel, pavement repair, crack seal and chip seal of the approved segments.