Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 7,315 | 385 | 7,700 |
Right of Way | 0 | 0 | 0 |
Construction | 56,620 | 2,980 | 59,600 |
Project Totals | $63,935 | $3,365 | $67,300 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Chip seal and fog seal from Main Avenue to the City limits near Pine Avenue. Grind and overlay the pavement at the intersection of Main Avenue with 0.15 feet of HMA.