Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 90,388 | 3,476 | 93,864 |
Project Totals | $90,388 | $3,476 | $93,864 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
96.3% | 3.7% | 0% |
Chip seal multiple segements.