City of Dayton
FY 2021 Seal Coat Project
Multiple Locations
TIB Award Amount
$121,600
Region: East   |   Legislative District: 16   |   Length: 0.00 mi. FY 2021 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 2,850 150 3,000
Right of Way 0 0 0
Construction 118,750 6,250 125,000
Project Totals $121,600 $6,400 $128,000

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

The work includes pavement repair near the intersection with US 12, crack sealing, preleveling, chip seal, fog seal, and striping. Cameron Street is an important industrial collector in the City of Dayton that also serves the Boys and Girls Club, Port of Columbia, Dayton School District sports fields, and the Columbia County Transfer Station. The street experiences high traffic and is in need of preservation to maintain satisfactory pavement conditions and prevent future failure.