Region: East | Legislative District: 15 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 37,600 | 0 | 37,600 |
Right of Way | 0 | 0 | 0 |
Construction | 288,840 | 0 | 288,840 |
Project Totals | $326,440 | $0 | $326,440 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Mill existing 11-foot travel lanes to a depth of 2-inches and inlay the roadway. Subgrade repair will be included in areas determined necessary. Many of the curb ramps in this segment have recently been upgraded. Upgrading these 2 ramps will complete the work on this segment to provide ADA compliant pedestrian facilities.