Town of Pe Ell
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$104,000
Region: West   |   Legislative District: 20   |   Length: 0.00 mi. FY 2021 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 12,000 0 12,000
Right of Way 0 0 0
Construction 92,000 0 92,000
Project Totals $104,000 $0 $104,000

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

The proposed project includes an asphalt overlay along Howard St from Pe Ell Ave to its dead-end. There currently is a water line that runs along the roadway's length within the right-of-way but outside the paved section. In June 2019, a Community Development Block Grant (CDBG) application was submitted to replace and upsize this leaking water line. Coordination between the two projects (asphalt overlay and water line replacement) would complement each other and insure construction of the projects independantly would not damage one another.