City of Montesano
FY 2021 Overlay Project
Multiple Locations
TIB Award Amount
$125,000
Region: West   |   Legislative District: 19   |   Length: 0.00 mi. FY 2021 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 125,000 15,000 140,000
Project Totals $125,000 $15,000 $140,000

Local Match

TIB Participation Local Match Minimum Local Match
89.3% 10.7% 5%

Description of Improvements

Plane 1" existing asphalt to top of existing concrete road section in this heavily utilized east/west corridor. Prelevel and install 2" HMA overlay. City crew to repair deficient sidewalk and curbs on the south side. Curb height is high on both sides and will allow for 2" overlay. City crews will also replace non-compliant curb ramps and install storm drains at the Chehalis Street intersection before the overlay work commences.