Region: West | Legislative District: 40 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 3,986 | 704 | 4,690 |
Right of Way | 0 | 0 | 0 |
Construction | 43,878 | 7,743 | 51,621 |
Project Totals | $47,864 | $8,447 | $56,311 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 5% |
County to furnish and install maintenance BST to exisitng roadway surface. Town contractor to furnish and install striping.