|
|
||||
Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 39,635 | 0 | 39,635 |
Project Totals | $39,635 | $0 | $39,635 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Dig outs on damaged wheel paths, then chipseal the entire travel surface.