Region: Puget Sound | Legislative District: 30 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 20,115 | 2,465 | 22,580 |
Right of Way | 0 | 0 | 0 |
Construction | 154,219 | 18,896 | 173,115 |
Project Totals | $174,334 | $21,361 | $195,695 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
89.1% | 10.9% | 5% |
This project provides a 2 inch overlay of existing roadway with pavement repair.