|
|
||||
Region: Puget Sound | Legislative District: 5 | Length: 0.00 mi. | FY 2021 Small City Preservation Program (SCPP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 2,550 | 450 | 3,000 |
Right of Way | 0 | 0 | 0 |
Construction | 100,534 | 17,741 | 118,275 |
Project Totals | $103,084 | $18,191 | $121,275 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 10% |
Chip seal and minor pavement repair