City of Soap Lake
Main Avenue W
Cherry St S to Ginkgo St S
TIB Award Amount
$1,150,000
Region: East   |   Legislative District: 12   |   Length: 0.21 mi. FY 2024 Small City Arterial Program (SCAP)

Existing Conditions

Main Avenue West is a collector street that extends from the Central Business District to the residential neighborhoods on the west side of the City. The street has been a priority for repair for many years. In 2008, the City overlayed and reconstructed sidewalks from Division to Cherry. At that time, the utilities were determined to be in very poor condition. The City has recently replaced water and sewer mains from Cherry St to the west. The roadway has poor pavement and sidewalks with extensive spalling and alligator cracking. The roadway is also very wide.

Project Funding

  TIB Funds Local Funds Total Costs
Design 132,500 0 132,500
Right of Way 0 0 0
Construction 1,017,500 0 1,017,500
Project Totals $1,150,000 $0 $1,150,000

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

CTB pavement reconstruction, remove damaged sidewalks, reconstruct sidewalk on one side. Narrow lane widths and add stormwater facilities.