City of George
Washington Way N
Richmond Ave to Frontage Rd
TIB Award Amount
$699,580
Region: East   |   Legislative District: 13   |   Length: 0.51 mi. FY 2023 Small City Arterial Program (SCAP)

Existing Conditions

Washington Way North is an essential route, connecting Frontage Rd to Royal Anne Drive and provides critical access route to WSDOT, USBR, and truck scale facilities along the corridor. The roadway sees a high percentage of trucks (over 40%) and is classified as a T-4 truck route. Intersection geometry are obstacles for the truck and vehicle traffic to navigate. The average PCR of the roadway in 2018 was 47.

Project Funding

  TIB Funds Local Funds Total Costs
Design 80,655 4,245 84,900
Right of Way 0 0 0
Construction 618,925 32,575 651,500
Project Totals $699,580 $36,820 $736,400

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 0%

Description of Improvements

The roadway will be pulverized, graded, improved with cement treated base, and pave the roadway. Intersections with Royal Anne Drive and Frontage Road will remove existing traffic islands to better accommodate truck turning movements.