Town of Coulee Dam
6th Street
Aspen St to Tulip St
TIB Award Amount
$892,611
Region: East   |   Legislative District: 12   |   Length: 0.25 mi. FY 2023 Small City Arterial Program (SCAP)

Existing Conditions

6th Street is one of the busiest roads in Coulee Dam serving the Casino, church, US Post Office, and grocery store. The roadway was originally construction out of concrete during the construction of Coulee Dam in the 1940s. The concrete cold joints have deteriorated through the decades resulting in full-depth voids up to 5 inches in width and is the Citys number one project. Various efforts have been made through the years to bridge reflected cracks, including various fabric, and overlays to no avail. The existing roadway has discontinuous sidewalks on one side, and existing crosswalks going across 6th Street do not have ramps.

Project Funding

  TIB Funds Local Funds Total Costs
Design 119,015 0 119,015
Right of Way 0 0 0
Construction 773,596 0 773,596
Project Totals $892,611 $0 $892,611

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Reconstruction of the roadway will include grinding off the existing asphalt overlays, and rubblizing the existing concrete in place. The rubblizing concrete will make up the roadway base which will be graded to subgrade with some CSTC and surfaced with HMA. The roadway will be narrowed from 35 feet to 22 feet, and constructing a sidewalk along the south side. with ADA compliance ADA ramp at the pedestrian crossings.