Region: West | Legislative District: 40 | Length: 0.24 mi. | FY 2023 Small City Arterial Program (SCAP) |
Existing ConditionsThe existing street is showing signs of surface and subgrade failure. There are not any pedestrian facilities and the existing illumination is inadequate. This project connects two arterials in the Town, Spring Street and Guard Street. The Town completed improvements on Marguerite between Park Street and Guard Street in 2020. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 91,128 | 87,177 | 178,305 |
Right of Way | 10,222 | 9,778 | 20,000 |
Construction | 698,650 | 668,359 | 1,367,009 |
Project Totals | $800,000 | $765,314 | $1,565,314 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
51.1% | 48.9% | 10% |
This project will provide an accessible pedestrian connection between residential neighborhoods, daycare, pre-schools, private schools, library, the high school, a church, a baseball park, and professional services. By reconstructing the street and installing sidewalks and illumination the Town will provide a safe and efficient route for motorists and pedestrians.