City of Elma
12th Street Improvements
Wakefield Ave to Harding St
TIB Award Amount
$414,890
Region: West   |   Legislative District: 24   |   Length: 0.13 mi. FY 2022 Small City Arterial Program (SCAP)

Existing Conditions

12th Street is a north/south connector street that provides access to downtown to the south and residential neighborhood to the north. The existing street surface is alligatored and cracking with areas of rutting and missing pavement. The east side of the roadway has curb, gutter, sidewalk and closed system drainage and is proposed to be retained. Three existing ADA ramps within the project limits do not meet current ADA requirements and will be updated. As there is limited storm drainage on the west side causing runoff to flow on to private property during heavy rainfall events, closed system drainage will be added to the west side and directed to a treatment and infiltration swale at the NW corner of 12th and Wakefield.

Project Funding

  TIB Funds Local Funds Total Costs
Design 47,864 18,136 66,000
Right of Way 0 0 0
Construction 367,027 139,073 506,100
Project Totals $414,890 $157,210 $572,100

Local Match

TIB Participation Local Match Minimum Local Match
72.5% 27.5% 5%

Description of Improvements

Reconstruct the existing roadway surface, while retaining the existing curb, gutter, sidewalk and storm drainage on the east side. Install curb, gutter and closed system drainage and on the west side to keep roadway runoff from flowing on to private property, and discharge collected runoff to a treatment and infiltration swale at the NW corner of 12th and Wakefield.