City of Warden
N Country Road
First St(SR 170) to N C/L
TIB Award Amount
$652,500
Region: East   |   Legislative District: 13   |   Length: 0.51 mi. FY 2022 Small City Arterial Program (SCAP)

Existing Conditions

County Road connects SR 170 and the Central Business District to the industrial/agricultural facilities in the northern portion of the City and extending north as Road U SE to I-90. The road is used by the agricultural production facilities within the City limits, as well as farm to market trucks and traffic passing through the City. Truck use of the roadway is very heavy during harvest times. The City is also exploring the possibility of constructing a truck park and ride type facility that would be located just north of the project limits. The existing roadway shows signs of subgrade failure (alligator cracking) as well as other signs of distress (thermal cracking, etc.).

Project Funding

  TIB Funds Local Funds Total Costs
Design 75,150 8,350 83,500
Right of Way 0 0 0
Construction 577,350 64,150 641,500
Project Totals $652,500 $72,500 $725,000

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 5%

Description of Improvements

The existing roadway will be pulverized, cement-treated, and overlaid with new asphalt.