Existing Conditions

1st Street is in the downtown core and provides direct access to businesses including a museum, hotel, and restaurants. The existing roadway has been patched multiple times for repairs and utility trench work. The asphalt is over 30 years old and has reached the end of its life.

Project Funding

  TIB Funds Local Funds Total Costs
Design 43,316 6,472 49,788
Right of Way 0 0 0
Construction 476,476 71,197 547,673
Project Totals $519,791 $77,670 $597,461

Local Match

TIB Participation Local Match Minimum Local Match
87.0% 13.0% 10%

Description of Improvements

Grind 8 feet next to curb and gutter on both sides, and provide a 2-inch overlay. There will be limited areas of pavement repair (10%).