Region: West | Legislative District: 40 | Length: 0.11 mi. | FY 2022 Small City Arterial Program (SCAP) |
Existing Conditions1st Street is in the downtown core and provides direct access to businesses including a museum, hotel, and restaurants. The existing roadway has been patched multiple times for repairs and utility trench work. The asphalt is over 30 years old and has reached the end of its life. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 43,316 | 6,472 | 49,788 |
Right of Way | 0 | 0 | 0 |
Construction | 476,476 | 71,197 | 547,673 |
Project Totals | $519,791 | $77,670 | $597,461 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
87.0% | 13.0% | 10% |
Grind 8 feet next to curb and gutter on both sides, and provide a 2-inch overlay. There will be limited areas of pavement repair (10%).