City of Leavenworth
14th Street
Commercial St to Front St
TIB Award Amount
$488,300
Region: East   |   Legislative District: 12   |   Length: 0.06 mi. FY 2021 Small City Arterial Program (SCAP)

Existing Conditions

The street is located in Leavenworth's downtown core with many retail and industrial businesses taking access off of it. 14th Street also provides access for the Town recycling center. Additionally, the existing curb, gutter, and sidewalk is chipped and falling apart. The City needs this project because this corridor is a vital route for tourism and for the residents of Leavenworth.

Project Funding

  TIB Funds Local Funds Total Costs
Design 65,727 3,473 69,200
Right of Way 0 0 0
Construction 422,573 22,327 444,900
Project Totals $488,300 $25,800 $514,100

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

The solution is to completely rebuild 14th Street including curb, gutter, and sidewalk with full depth reclamation and possibly cement treated base depending on the underlying soils.