City of Harrington
W Adams Street
Railroad Tracks to 2nd St
TIB Award Amount
$293,300
Region: East   |   Legislative District: 13   |   Length: 0.12 mi. FY 2021 Small City Arterial Program (SCAP)

Existing Conditions

This section of roadway is located on one of three streets in town that cross the railroad. The roadway is in poor condition with a pavement condition rating of 46. The roadway has alligator cracking and drainage issues. This roadway is one of the direct paths to and from the golf course.

Project Funding

  TIB Funds Local Funds Total Costs
Design 39,400 0 39,400
Right of Way 0 0 0
Construction 253,900 0 253,900
Project Totals $293,300 $0 $293,300

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

The proposed solution is to do a full depth reclamation of the roadway. This will involve paving the travelways with 2 inches of asphalt and add rolled curb on each side of the travelways to properly direct drainage. Gravel parking is also proposed on each side of the roadway, which will be 4 inches thick.