City of Buckley
River Avenue
Jefferson Ave to Main St
TIB Award Amount
$285,063
Region: Puget Sound   |   Legislative District: 31   |   Length: 0.27 mi. FY 2021 Small City Arterial Program (SCAP)

Existing Conditions

River Avenue connects Ryan Rd (Minor Arterial) on its south end to Buckley's Central Buisness District on Main St (Major Collector). The poor condition of the existing pavement neccesitates rebuilding the asphalt and subgrade to improve functionality and safety. This project is a logical next step as the southern portion of the road was recently reconstructed up to the intersection of River and Jefferson. Improving River Ave from Jefferson to Main will complete this section and bring all ramps up to ADA standards.

Project Funding

  TIB Funds Local Funds Total Costs
Design 32,890 5,805 38,695
Right of Way 0 0 0
Construction 252,173 44,502 296,675
Project Totals $285,063 $50,307 $335,370

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 5%

Description of Improvements

To address the failing roadway structure, approximately 1400 ft of pavement from curb to curb will recieve a 2-inch grind and overlay. In addition, all curb ramps within the project limits will be brought up to current ADA standards.