Region: West | Legislative District: 19 | Length: 0.09 mi. | FY 2021 Small City Arterial Program (SCAP) |
Existing ConditionsMarcy Street is an arterial that provides service to various businesses, residents and public services/facilities. The exisitng street is in very poor condition fromMain Street to 1st Street. The sidewalks are badly deteriorated in various areas. 1st Street at the west end of the proposed Marcy Reconstruction is a primary route to County Buildings and business and has some deterioration issues that need to be addressed. This project is an extension of two recent SCAP project on Marcy and will tie in to a future FHWA project on W. Pioneer. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 49,500 | 5,500 | 55,000 |
Right of Way | 0 | 0 | 0 |
Construction | 475,200 | 52,800 | 528,000 |
Project Totals | $524,700 | $58,300 | $583,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Reconstruct Marcy Avenue from Main to 1st and 1st Street from Pioneer to Marcy. Sidewalks along Marcy would be replaced using conventional methods with new curb and gutter. Sidewalks along 1st are adequate and will remain. The grass strip along the west side of 1st Street will be expanded to reduce the road width and provide additional pedestrian safety on the Fleet Park side of the street.