Region: East | Legislative District: 15 | Length: 0.51 mi. | FY 2021 Small City Arterial Program (SCAP) |
Existing ConditionsThe existing roadway provides access to Zillah's active commercial district that parallels I-82 via the signalized intersection at W. First Ave. (previous TIB-funded project). The existing pavement condition is very poor with significant wheel rutting and areas of severe transverse and alligator cracking evident across the entire roadway section. Sidewalk gaps on the north side, no sidewalk on the south, and poor drainage are additional defeciencies. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 925,000 | 288,890 | 1,213,890 |
Project Totals | $925,000 | $288,890 | $1,213,890 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
76.2% | 23.8% | 5% |
The project consists of a 2" grind and overlay for the entire existing road section, sidewalk improvements with ADA ramps to both sides of Vintage ValleyParkway, improved storm drainage, new street lighting, and construction of a new 1,200 LF extension of the roadway to access the balance of the commercial property. The road will be constructed to a 41-foot back of curb to back of curb section including a combined bike and travel lane.