Town of LaCrosse
Main Street Sidewalks
2nd St to A St
TIB Award Amount
$414,200
Region: East   |   Legislative District: 9   |   Length: 450.00 ft. FY 2024 Urban Active Transportation Program (ATP)

Existing Conditions

Currently, there is not a pedestrian connection between the City Park and downtown area. Pedestrians currently walk in the street to get from one facility to another. This sidewalk would also be a main connection between downtown and the school.

Project Funding

  TIB Funds Local Funds Total Costs
Design 55,700 0 55,700
Right of Way 0 0 0
Construction 358,500 0 358,500
Project Totals $414,200 $0 $414,200

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Install a sidewalk along the south side of Main Avenue.