City of Granite Falls
W Stanley Street Sidewalk
Jordan Rd to Prospect Ave
TIB Award Amount
$496,400
Region: Puget Sound   |   Legislative District: 39   |   Length: 960.00 ft. FY 2024 Urban Active Transportation Program (ATP)

Existing Conditions

Stanley Street is the main east-west corridor through the City. Previous projects, funded by both the City and Developers, have installed sidewalks on both sides of the street from Jordan Road to Alder Avenue with the exception of two gaps on the north side of Stanley Street. The gaps include Jordan Road to the west side of the O Reilly Auto Parts frontage improvements (approximately 500 feet) and from the east side of the O Reilly Auto Parts frontage improvements to east of the Napa Auto Parts store (approximately 460 feet). Closing these gaps will complete the pedestrian facilities through the core of the City.

Project Funding

  TIB Funds Local Funds Total Costs
Design 39,704 2,096 41,800
Right of Way 0 0 0
Construction 456,696 24,104 480,800
Project Totals $496,400 $26,200 $522,600

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Install new cement concrete curb, gutter and sidewalks on the north side of Stanley Street to fill in the gaps in the existing sidewalk system.