City of Grandview
Wine Country Road Overlay
Euclid St to Grandridge Rd
TIB Award Amount
$470,790
Region: Southeast   |   Legislative District: 15   |   Length: 0.00 mi. FY 2025 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 48,150 5,350 53,500
Right of Way 0 0 0
Construction 422,640 46,960 469,600
Project Totals $470,790 $52,310 $523,100

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

2" grind and overlay with prelevel.