Region: Southeast | Legislative District: 15 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 48,150 | 5,350 | 53,500 |
Right of Way | 0 | 0 | 0 |
Construction | 422,640 | 46,960 | 469,600 |
Project Totals | $470,790 | $52,310 | $523,100 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
2" grind and overlay with prelevel.