City of Aberdeen
2022 Overlay Award
Multiple Locations
TIB Award Amount
$475,000
Region: Southwest   |   Legislative District: 19   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 475,000 93,643 568,643
Project Totals $475,000 $93,643 $568,643

Local Match

TIB Participation Local Match Minimum Local Match
83.5% 16.5% 15%

Description of Improvements

2 inch grind and overlay