City of Brier
2022 Overlay Award
Multiple Locations
TIB Award Amount
$1,045,500
Region: Puget Sound   |   Legislative District: 1   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 89,250 15,750 105,000
Right of Way 0 0 0
Construction 956,250 168,750 1,125,000
Project Totals $1,045,500 $184,500 $1,230,000

Local Match

TIB Participation Local Match Minimum Local Match
85.0% 15.0% 15%

Description of Improvements

The project grinds and provides a 2-inch overlay the following segments: 214th St SW - Poplar Wy and 36th Ave W - 5 ADA ramps Old Poplar Way - 228th St to Brier Rd - 5 ADA ramps