Region: Puget Sound | Legislative District: 45 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 399,500 | 70,500 | 470,000 |
Project Totals | $399,500 | $70,500 | $470,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
This project grinds, patches and provides a 2 inch overlay, striping and ADA curb ramp retrofits of the follow segments Cherry Valley Road - SR 203 to C/L - 2 ADA Ramps Big Rock Road - SR 203 to Pavt Change - 4 ADA Ramps