City of Fircrest
2022 Overlay Award
Multiple Locations
TIB Award Amount
$678,471
Region: Puget Sound   |   Legislative District: 28   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 84,103 9,345 93,448
Right of Way 0 0 0
Construction 594,367 66,041 660,408
Project Totals $678,471 $75,385 $753,856

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

This project grinds and provides a 2-inch overlay of the southbound lanes of Orchard Street 24 feet of pavement Orchard Street - Holly Dr to Center St upgrade 7 ADA Ramps