Region: Southwest | Legislative District: 19 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 79,200 | 8,800 | 88,000 |
Right of Way | 0 | 0 | 0 |
Construction | 404,396 | 44,933 | 449,329 |
Project Totals | $483,596 | $53,733 | $537,329 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
2 inch grind and overlay