|
|
||||
Region: Southwest | Legislative District: 18 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 468,157 | 82,616 | 550,773 |
Project Totals | $468,157 | $82,616 | $550,773 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
2 inch grind and overlay