Region: Puget Sound | Legislative District: 30 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 47,600 | 8,400 | 56,000 |
Right of Way | 0 | 0 | 0 |
Construction | 438,160 | 77,328 | 515,488 |
Project Totals | $485,759 | $85,729 | $571,488 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
This project grinds and provides a 2-inch overlay on the following segments: Milton Way - Oak St to 15th Avenue Milton Way - 15th Avenue to Juniper St - 2 ADA Ramps Porter Way - Fife Way to Milton Way