City of Ephrata
Nat Washington Way Overlay
A Street SE to 3rd Ave SE
TIB Award Amount
$563,134
Region: Northeast   |   Legislative District: 13   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 86,580 9,620 96,200
Right of Way 0 0 0
Construction 476,554 52,951 529,505
Project Totals $563,134 $62,571 $625,705

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

Digouts, crack sealing where needed. Grind and overlay. Replace noncompliant curb ramps and curbing. Nat Washington Way - A St SE to 2nd Ave SE