City of Pullman
Bishop Boulevard Overlay
Fairmount Dr to w/o SR 270
TIB Award Amount
$554,331
Region: Northeast   |   Legislative District: 9   |   Length: 0.00 mi. FY 2024 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 9,327 2,673 12,000
Right of Way 0 0 0
Construction 545,004 156,201 701,205
Project Totals $554,331 $158,874 $713,205

Local Match

TIB Participation Local Match Minimum Local Match
77.7% 22.3% 15%

Description of Improvements

Grind/haul 2 in. HMA. Main travel lanes only, typ not TWLTL. 30 ft typ mill width, 45 ft wide at far north end. Skip two bridges and their approaches (done in 2018). Surface prep, spot repair, overlay w/2 in. HMA, restripe, and other incidental work for the following segment: Bishop Boulevard - Fairmount Dr to w/o SR 270