Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2024 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 9,327 | 2,673 | 12,000 |
Right of Way | 0 | 0 | 0 |
Construction | 545,004 | 156,201 | 701,205 |
Project Totals | $554,331 | $158,874 | $713,205 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
77.7% | 22.3% | 15% |
Grind/haul 2 in. HMA. Main travel lanes only, typ not TWLTL. 30 ft typ mill width, 45 ft wide at far north end. Skip two bridges and their approaches (done in 2018). Surface prep, spot repair, overlay w/2 in. HMA, restripe, and other incidental work for the following segment: Bishop Boulevard - Fairmount Dr to w/o SR 270