Region: Northeast | Legislative District: 6 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 43,742 | 4,858 | 48,600 |
Right of Way | 0 | 0 | 0 |
Construction | 489,558 | 54,367 | 543,925 |
Project Totals | $533,300 | $59,225 | $592,525 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Remove and replace non-compliant ADA ramps within the project limits; remove areas of alligator cracking and provide new HMA patch; seal all existing cracks, 1/4 and larger; provide 7 wide taper grind along shoulders to maintain curb reveal; grind as