|
|
||||
Region: Puget Sound | Legislative District: 44 | Length: 0.00 mi. | FY 2023 Arterial Preservation Program (APP) |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 4,250 | 750 | 5,000 |
Right of Way | 0 | 0 | 0 |
Construction | 90,525 | 15,975 | 106,500 |
Project Totals | $94,775 | $16,725 | $111,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Grind and 2-inch overlay of Avenue D - 1st St to 2nd St